kyleq wrote:Hi Lane. Was this in the week or month view? Or did it happen in both? Did the problem happen when you clicked on the Create Event button or only when you clicked in the calendar grid? Were you picking dates from the date picker or typing in the dates? Also, what were the dates that the system was complaining about?
I can't replicate the problem but I certainly would like to try and track it down.
This was in the month view. I clicked on the calendar grid. I tried both the date picker and entry of the dates. I confirmed that the values in the date field were formatted correctly and that there was not any extraneous whitespace. I also tried to copy/paste the date from the "start" field which wasn't complained about.
Since the validation flagged a format issue in the field, I was unable to proceed with the creation of the event.
In one case, I was able to successfully reuse an event that was to be deleted and re-purpose it for the event that I was trying to create. In the another case, I accepted the incorrect end date and then attempted to edit the date. Oddly, when I opened the event to edit it, the date had corrected itself from the wrong date (one day ahead) to the right date.
BTW, I was doing this after 10:00PM MST. I wondered if there was an issue with the timezone setting and it was picking up EST, thus rolling me into another day. If I click on a calendar grid this morning, both the start and end dates are the date clicked, and are correct.
Come to think of it, I started adding calendar events before 10:00pm MST and spanned into the 10:00pm hour. It was only the later entries where this was a problem. Maybe that's a red herring, but may be worth a try. The previous poster responded to the post after 11:00pm. Perhaps there is something in the window 10:00pm MST - 11:00pm MST.
Hope this helps.