Here's the Answer:
"It looks like the problem may be that the FM group hasn’t correctly updated which stake the buildings are assigned to. When I proxy as the stake clerk of the Grand River Missouri stake, I see seven buildings and the agent stake for all of them is the Far West Missouri stake.
"The event shown in the thread is directly on a location calendar and that calendar is owned by the Far West stake because that location has the Far West stake as its agent stake.
"The new Grand River Missouri stake also can’t add any building schedulers (in the calendar system) because it is not the agent stake for any building.
"The new events show as owned by his old stake because he is still a building scheduler for the “Grand River Valley, Tongan Ward (Trenton)” building, even though he is no longer in the Far West stake. We do not remove building schedulers automatically when a person moves stakes. A Far West stake leader can remove him.
"I don’t know why edits he tries to make to events are not working. That would need some more investigation. However, we should probably automatically remove building schedulers when they move stakes and that will take care of the problem. Building schedulers are supposed to be members of the building’s agent stake. When you go to add a building scheduler, you can only add members from the agent stake."
As for how long from FM update to calendar update,
"It varies because for a given user, the facilities data is only checked at most once every 8 days. So, the time is determined by who opens the Calendar and how often. At most it’s 8 days, but it’s more likely to be a couple of days or less."
So, bottom line:
- Lean on your FM group to update their database. (I'd start with the stake Physical Faculties Rep).
- Wait for it to sync.
- Have a stake calendar administrator go into the calendar webpage, Gear icon > Building Schedulers, select the building, and add you by name.
Then things should work like before. However, I would look over the help files as to how the calendar system was intended to be used. It's not just for scheduling buildings, but to let members know about activities. But that doesn't work right if stakes hang on to the pre-web tradition of Building Schedulers doing all the scheduling. (Personally, I'd like to see the calling renamed.)