Member
I can't recall if this changed with this last new build (2.0.2-rev.2509). Has the ability for building schedulers to override a reservation "block" with a regular reservation been removed?
I can schedule an event over a reservation block, but I cannot add a reservation for a unit because the block is in place. That doesn't seem right. If I can create an event, shouldn't I also be able to create a reservation? Is this the expected behavior?
I can schedule an event over a reservation block, but I cannot add a reservation for a unit because the block is in place. That doesn't seem right. If I can create an event, shouldn't I also be able to create a reservation? Is this the expected behavior?