New Member
I am feeling like i don't need building schedulers with the new calendar, since the submitter can list the location and the resource. What do you see as the need for the building scheduler?
The role of building scheduler is quite different from what it was on the classic LUWS calendar, or other systems that may have been used in the past. There is no need to have someone who keeps the master calendar and approves or denies all requests for the building.porterjl wrote:I am feeling like i don't need building schedulers with the new calendar, since the submitter can list the location and the resource. What do you see as the need for the building scheduler?
Any ward calendar editor could do this via a ward calendar, but there are some benefits in having a building-oriented calendar for such events.RussellHltn wrote:What about scheduling private events such as weddings, birthday partys, etc? Someone is needed to be a point of contact with the ability to enter those in the designated resource calendar.
It's fine when things go well, but it really helps to have a designated person in authority to make decisions when something like a funeral disrupts other scheduled activities and some rather hasty reshuffling of resources is required.tomjohnson1492 wrote:Some wards would prefer that all events be scheduled through the building scheduler. Others feel the role is superfluous.
porterjl wrote:I am feeling like i don't need building schedulers with the new calendar, since the submitter can list the location and the resource. What do you see as the need for the building scheduler?
mawhiteley wrote:Perhaps I'm missing something too. Even though I reserve resources on the building resource calendar, the ward calendar does not show these events. No sync!
Yes, the new calendar. I'm the building schedular for 2 wards. The event is on the ward calendar with resources reserved. But then there is also a Building Resource calendar that is not sync'd (either direction). I'm creating two events: 1) on my ward calendar, and 2) in the building resource calendar so the other ward gets conflict warnings (albeit no resource availability prior to them *trying* to schedule something).RussellHltn wrote:If you're talking about the Classic LUWS calendar, you're right, there is no sync.
If you're talking about the new calendar, then I'd suggest placing the event on the ward calendar and then reserving those resources you need.
mawhiteley wrote:The event is on the ward calendar with resources reserved. But then there is also a Building Resource calendar that is not sync'd (either direction).
mawhiteley wrote: In theory, another member will get a conflict when they try to create an overlapping event, but there is no resource reservation viewable to them so they can see what's open.
mawhiteley wrote:Thanks. I've read the referenced document a couple times. However, I still must have a conceptual misunderstanding on how it is supposed to work, or my permissions on the calendar must allow me to do anything, conflicting or not..
I've tried this before. It only shows the building resources assigned to my ward. I cannot see the resources I have assigned to the other ward. If it did, this would solve a lot of problems.aebrown wrote:If they do want to see what is reserved for a particular building, they can check the box by the location name under Subscribed Locations. Only calendar editors have this option. However, this only shows the events that use any resource in the selected building. It doesn't tell you exactly which resources are reserved -- you still have to examine the event details to see that.
I think you're still confusing reservations with assignments. The only place you can see assignments is on the Manage Resource Assignments page. When you (or any other editor) checks the box by the location under Subscribed Locations on the main calendar view, you will see the events that are scheduled for the building.mawhiteley wrote:I've tried this before. It only shows the building resources assigned to my ward. I cannot see the resources I have assigned to the other ward. If it did, this would solve a lot of problems.
mawhiteley wrote:Something doesn't seem correct/efficient in this new calendar tool.
aebrown wrote:I think you're still confusing reservations with assignments. The only place you can see assignments is on the Manage Resource Assignments page. When you (or any other editor) checks the box by the location under Subscribed Locations on the main calendar view, you will see the events that are scheduled for the building.
You will never see assignments on the main calendar view. If you think you're seeing your ward's assignments on the main calendar view, that is only because you created both an assignment and a reservation for the same event (as you said you were doing in your original post).
Not if the other ward has the resources. You are blind and have to roll the dice to try and find an open resource/date/time. Even I, as the building scheduler, cannot see the other ward's calendar to try and alleviate the resource reservation lottery between wards.jdlessley wrote:The resources that have been reserved can be determined by viewing the details for each scheduled event on any given day. From that, if you have the patience, you can determine the resources that have not been scheduled.
mawhiteley wrote:Not if the other ward has the resources. You are blind and have to roll the dice to try and find an open resource/date/time. Even I, as the building scheduler, cannot see the other ward's calendar to try and alleviate the resource reservation lottery between wards.
That's good news. As I was looking for a method to submit complaints to the developers, I ran across this site. Great resource! Thanks.
kd7mha wrote:In the subscribed locations section if I select a location I can see the details of all the events in that location regardless the ward that has them reserved.
No configuration is necessary. That's just how it works. But note that you can only see actual reservations associated with events -- you can't see resource assignments this way.mawhiteley wrote:Oh, that's encouraging! When I select that option, I only see reservations pertaining to my ward. It would solve a lot of problems *if* we could see the other wards building reservations. Any setting/configuration that needs to be enabled for this? Thanks.
Oh, thanks! I wonder if someone could grant me permissions to the other ward's calendar so I can associate reservations with events. Then members could see building use reservations from either ward.aebrown wrote:No configuration is necessary. That's just how it works. But note that you can only see actual reservations associated with events -- you can't see resource assignments this way.
An approver, calendar editor, and building scheduler is able to see all calendars for a location no matter which ward the calendar is from.mawhiteley wrote:Even I, as the building scheduler, cannot see the other ward's calendar to try and alleviate the resource reservation lottery between wards.
mawhiteley wrote:Oh, thanks! I wonder if someone could grant me permissions to the other ward's calendar so I can associate reservations with events. Then members could see building use reservations from either ward.
The new calendar does combine event and resource scheduling in the same part of the user interface. For most events, this is very convenient way to make sure that the resource gets scheduled, and if the event gets moved or deleted, so does the resource reservation.rpyne wrote:I have seen several people request that events and resource assignments be "synchronized" so that scheduling an event automatically schedules a resource or vice-versa. I would argue against this. In most cases you need to reserve the resource for a considerably longer time than an event to allow for setup and cleanup time.
The building scheduler has full rights over any events scheduled for his building. He can delete those events, adjust resources, or adjust dates and times. For an overview, see Building Schedulers in the Calendar help system.srweight wrote:OK, the 4 items are great but the question is how does the building scheduler override conflicts? Also is there a difference between the rights of a building scheduler and the Stake Building Specialist?
For calendaring, there's a huge difference -- the Stake Building Specialist has no rights at all for the calendar. An approver can grant rights to a person who serves as a Stake Building Specialist, but that's the same as for any other member.srweight wrote:Also is there a difference between the rights of a building scheduler and the Stake Building Specialist?
Ok, I have seen this information but don't see "How" a building scheduler does these functions. Maybe it is because I am not just a Building Scheduler but am also the Stake butt't Clerk - Tech Specialist.aebrown wrote:The building scheduler has full rights over any events scheduled for his building. He can delete those events, adjust resources, or adjust dates and times. For an overview, see Building Schedulers in the Calendar help system.
For calendaring, there's a huge difference -- the Stake Building Specialist has no rights at all for the calendar. An approver can grant rights to a person who serves as a Stake Building Specialist, but that's the same as for any other member.
srweight wrote:Ok, I have seen this information but don't see "How" a building scheduler does these functions. Maybe it is because I am not just a Building Scheduler but am also the Stake butt't Clerk - Tech Specialist.
The role of Stake Building Specialist has no role in the calendar, so you won't find any documentation that mentions that calling -- it's no different from the CTR 5 teacher, or any other calling that has no connection to the calendar. Of course, any member can be given a role as a building scheduler or as a calendar editor.srweight wrote:As to the Stake Building Specialist - what is his/her role and where do I fine that in the Help section?
aebrown wrote:From the perspective of the calendar, being an assistant stake clerk makes you an Approver for the stake calendars. Being a building scheduler is not related to your calling, but is an assignment made per location in the Calendar system (under Manage Locations and Resources). Since you are a stake Approver, you do have the rights to assign yourself as a building scheduler for any location.
But I personally have that same calling, and have also been designated a building scheduler for one of our buildings. Having both the calling and that assignment have not created any problems for me. If your question is how a building scheduler adjusts events, he simply edits events and makes changes. There is one little trick for seeing events, since you usually only see events that are on subscribed calendars for your ward or the stake: On the main calendar view, there is a section on the right for "Subscribed Locations"; check the box by the building you are interested in, and you will see all events that are scheduled for any resource in that building, even if they are scheduled by another ward.
The role of Stake Building Specialist has no role in the calendar, so you won't find any documentation that mentions that calling -- it's no different from the CTR 5 teacher, or any other calling that has no connection to the calendar. Of course, any member can be given a role as a building scheduler or as a calendar editor.
srweight wrote:Stake Building Specialist is a Standard Calling in MLS - Building Scheduler is not. I am just wondering why there is a Standard Calling for a Stake Building Specialist.