New Member
I've been cleaning up the mess that is my stake's A/V rack, and am curious to see what setups other stakes have.
Josh Peterson
Stake Technology Clerk - Hunter Central Stake
Stake Technology Clerk - Hunter Central Stake
Assuming this is a standard system (which it sounds like it is) instructions are working their way through the approval process. Yes, it's quite delayed, some of that is my fault, and some of it is just the nature of the approvals process. When ready, these will be made available to the FM managers, and likely other sources for most common, and standard systems types in the US and Canada.lajackson wrote:Ours is seven feet tall, and includes all video, audio, local program distribution, and white noise for the meetinghouse. It has outputs for webcasting and inputs for various types of audiovisual media finery, a video switcher, and a camera controller. It also has power supplies and amplifiers for chapel and cultural hall sound and feeds to all of the other speakers in the building.
There are quite a number of Ethernet connections going to various places, one of which is to a separate closet in another part of the building where all of the Internet access points and telephone lines are patched and switched, along with the firewall and incoming Internet service.
I think it does other stuff, also. But, sadly, it did not come with any instructions.
If its been 6 plus years, those were before my time, So I can't comment on that one, But newer ones than that are more likely my fault than anyone else.johnshaw wrote:I remember wanting instructions with a Brand New Meetinghouse built 6 years ago. That is a lengthy approval process. I was fine being 1) curious, 2) a person who doesn't wait for the decade long process for church instructions, and 3) being an audiophile/IT engineer - I made it through, but I was told for years about some kind of instructions that would be coming... and it's on it's way!
Ours is a year newer. (Hi, johnshaw, you were first.) New meetinghouse, second of its kind built, and I get to stand behind the choir to run the webcast. Great location. I can sing with them.StevePoulsen wrote:Assuming this is a standard system (which it sounds like it is) instructions are working their way through the approval process.
For the A/V system, you have to wait for the church to get around to modernizing your system. I think it's something like a 12 year cycle. But even then it may not be as modern as you'd like it.studerje wrote:Is there any process to modernize a stake center's a/v setup?
Russel gives a pretty positive number for a complete tech revamp, I was thinking it was more like 17 years last time I tried. BUT.... I was in the same situation you were in, my stake closet was pretty ugly just like yours probably is, and when we went to do the webcasts (just had a first one last fall) found a problem with the sound that was intermittent. We were able to get FM to contract out a 'clean-up' of the satellite box in the library, but even after it can be a pretty large challenge if you don't dare start pulling wires off, etc...studerje wrote:Our stake center has very old equipment and the A/V rack in the library looks like things have been bolted on using various converters and adapters. Is there any process to modernize a stake center's a/v setup? Especially curious as we are just starting to do stake conference broadcasts to our other buildings.
That might be. I just remember it was north of 10 years.johnshaw wrote:Russel gives a pretty positive number for a complete tech revamp, I was thinking it was more like 17 years last time I tried.
The correct answer to the question is more difficult. There is not specific timeline for replacement, though it is generally around the 20 year mark. This is because the FM has competing priorities, they are trying to balance, prevention of system failure, and maximizing the value derived form the equipment. This will sometime result in the equipment being driven till it fails, and then replaced, but may also result in one FM who has been burnt in the past seeking approval for replacement projects sooner than another. In both cases, the FM is relying on feedback to make these determinations. To aid in this, It is critical that issues are reported to the FM, IF that ward is fixing issues on their own with out informing the FM, they will of course think everything is working perfectly, and may put off replacement work longer than should have happened, had they known about issues. In this case, FIR is your friend.studerje wrote:Our stake center has very old equipment and the A/V rack in the library looks like things have been bolted on using various converters and adapters. Is there any process to modernize a stake center's a/v setup? Especially curious as we are just starting to do stake conference broadcasts to our other buildings.
That's assuming that FM is using FIR. I'm not sure as mine is. Some of the posts in the past make me think that I'm not alone.StevePoulsen wrote:If there are problems with your systems (or anything in the meetinghouse), the components or how it functions, be sure to notify the FM with a FIR request. Unlike the phone calls, emails etc, FIR requests are tracked at a level above the FM group, and provide valuable insight for the FM and others as to what the actual issues are, and how often they occur.