As stake clerk, I have assigned myself and one assistant stake clerk the role of building scheduler in addition to having a building scheduler for each of our three buildings. It is frustrating that we can not see all of the ward events scheduled for the particular building assigned. When an auxiliary leader desires to schedule an activity, the best we can do is walk them through the steps to schedule it themselves. We can not verify, nor can we modify if we do resolve a conflict between wards or between auxiliaries in a single ward. It appears the best we can do is block out (restrict) a time period on a date and wait for the ward to input their activity information. This is not helpful--actually, I find it useless.
What is the rationale for having ward events that the stake leaders can not see, and stake events that the wards can see but can not modify? Why have a "Stake Event - YSA Ward" and a "YSA Ward" event? What is the difference from the developers perspective?
When completing the annual stake history, a stake calendar is requested to be included. When printing this out, the only events that will be presented are those for the stake and my own home ward. I can not present all of the activities across the stake because of this restriction. Must we print ten calendars to get all of the events (WITH MANY DUPLICATES) that take place over the course of the year?
Should we change the calling to "building schedule referee" instead of "building scheduler"?
Please don't respond with "that's the way it's coded"... These scheduling and viewing rights should be assignable, and managed on a stake level, as needed.
For more discussion, feel free to email me at davereidy@cox.net.
Best regards,
Dave Reidy
--Programming since 1967
What is the rationale for having ward events that the stake leaders can not see, and stake events that the wards can see but can not modify? Why have a "Stake Event - YSA Ward" and a "YSA Ward" event? What is the difference from the developers perspective?
When completing the annual stake history, a stake calendar is requested to be included. When printing this out, the only events that will be presented are those for the stake and my own home ward. I can not present all of the activities across the stake because of this restriction. Must we print ten calendars to get all of the events (WITH MANY DUPLICATES) that take place over the course of the year?
Should we change the calling to "building schedule referee" instead of "building scheduler"?
Please don't respond with "that's the way it's coded"... These scheduling and viewing rights should be assignable, and managed on a stake level, as needed.
For more discussion, feel free to email me at davereidy@cox.net.
Best regards,
Dave Reidy